 |
 |
IET can provide work measurement
utilizing the appropriate tools for the client's needs. |
 |
Time Studies to Determine Standards |
 |
Predetermined Time Standards |
 |
Methods Analysis |
 |
Line Balancing |
 |
Delay and Downtime Analysis |
 |
Overall Equipment Effectiveness (O.E.E.) |
 |
Work Sampling Studies |
 |
Direct and Indirect Labor Analysis |
 |
Labor Utilization |
 |
Standard Operating Procedures and Job Instructions |
 |
Ergonomic Evaluation |
 |
Production Variance Analysis |
 |
Capacity Analysis |
 |