Line Balancing Utilizing Predetermined
Time Study
Line Balancing Utilizing Predetermined
Time Study
Quote:
"We were short resources
to dedicate to the task of balancing some of our lines. IET
had helped us with various projects in the past and we knew
they would provide us the support we needed to complete the
job properly and get us running smoothly."
- Engineering Manager
Industry:
Automotive Supplier
Assignment:
Perform predetermined time study on selected
assembly lines to balance the lines.
Challenge:
Identify areas where the client was losing
productivity and suggest feasible ways to balance lines to
increase efficiency.
IET's Solution:
IET studied the assembly lines for two
week, recording all operation elements. This included machine
downtime and operator error. Data was collected, totaled,
and discussed with the client.
Results:
Current throughput time was reduced from
48 seconds to 46 seconds utilizing existing layout and operators.
A second line was balanced from 73 seconds per piece to 58
seconds per piece.
IET also proposed a plan to improve the throughput rate by
20% without investing in any additional resources.
Another solution proposed various cost effective improvements
to achieve reduced operator motions and a target time of 42
seconds per piece.