| IET's Solution: |
 |
IET evaluated direct and indirect labor assignments, appropriate
manufacturing documentation, and simple feedback loops. Then
the project team developed an assembly system design that
minimized material handling, inventory requirements, inappropriate
sequencing, and operator balance delay. The design included
simple material handling, flexible work cells and labor assignments,
and Kanban component material delivery systems. Resulting
throughput time for a typical door was approximately six minutes.
|